Before & After: The house renovation is complete.

Finally, it is done….

For those who have noticed a somewhat silent blog recently, I do have a very valid reason as I have been slogging away 7 days a week over the last couple of months to get this house completed.  My life has been consumed by this project, but I now it is done I think I have enjoyed it…(?!)

I have learnt many new things; how to fit door architraves and skirting, mix plaster, fix windows, mitre corners properly and much more.  I think I have used about 125 litres of white emulsion, and got a sort of snow-blindness by the end of it.  My hands are like a workman’s, and I am exhausted and have spent hours in builders yards and sourcing things online to get the best prices  But it has been worth it, and I am on budget which is a miracle…

In the middle of the job my builders’ firm went bust, which could have been a total disaster and left me up the creek without a paddle so to speak, but we managed to muddle through and finish the renovation.  My builders honoured the contract and worked extra hours unpaid to finish the job, so someone up there was watching out for me I think!  It meant a 3 week delay on the build, and that I had to learn lots of new skills pronto, but circumstances meant that I just had to forge on.

Here come the before, mid-point and after pictures…..

The facade of the house…. from grubby magnolia to zingy blue… I got over vertigo on that scaffolding after a couple of days, and it was a lovely view…

900-8

IMG_2612

IMG_2775

The garden…. from rubbish dump to a much more elegant space…

The once small and festering loo… now a wall has been moved to create a spacious shower room…

IMG_3877

A large curved shower

IMG_3912

Simple clean lines

IMG_3878

Continue reading

House Renovation Diary Part 3

The renovation continues.  We are more than half way now, with a final push this next month to get it all done. The garden is landscaped and fenced, the kitchen is being fitted, the shower room is half in and tiled, and the bathroom awaits its turn this week.  My hands look appalling, all nails broken, with sugar soap having seeped into my gloves so they have puckered alarmingly.  I am getting through mountains of hand cream to try and repair the damage.

Main receptions and bedrooms are now mainly painted on newly plastered walls and ceilings, I am waiting to do most woodwork like skirting and architraves until the builders are out as the dust is chaotic. New doors are primed, painted and hung.  The main stairwell which winds up through the house has been lined and painted.  We only have two more walls to be plastered in a hallway and a bathroom.  The final job will be laying the flooring throughout.  It has been a 7 day a week job for me, and I am shattered, but I can see the end now.

So, here are some things I have learnt over the past couple of weeks:

  • Plaster can take a long time to dry when you want it to.
  • Plasterers are the MESSIEST people, although the walls and ceilings they work on are smooth perfection, the rest of the room, (especially the floors), look like a plaster bomb has gone off.  I have spent many hours scraping dried hunks off floorboards, windows, skirting and doors.  After some chatting up, I persuaded the plasterers to clean up as they went, but only after we were 6 rooms into the project…
  • When re-plastering walls, you might as well replace all skirting and architrave as the plasterers are also vandals who yank the existing ones off, cracking them in the process.  I have extra hours to do now repairing the damage.
  • New plaster also drinks paint, even with mist coats.  My initial estimate of 30 litres for the whole building is now at 90.  Luckily I have discovered Leyland’s acrylic based emulsion which is a one coat wonder, or I could be into the hundreds in terms of litres.
  • Always make friends with the Builders Yard staff.  I have managed to snitch a couple of free deliveries already, and they are experts at getting me in more paint from the manufacturers pronto when I clear their stock!
  • Chose water based satinwood for spindles and architraves, and oil based satinwood for doors and skirting.  The latter take the hardest knocks so need the 16 hour dry time, whilst the former can take the 4 hour version and get re-coated faster.
  • Builders thrive on a lot of tea, Krispy Creme Donuts and praise.  Apart from one errant Electrician who has vanished on a stag week to Bulgaria, mine are all pretty much present and correct.  We did have a few days to wait on wet plaster, but otherwise they have been pretty good so far.  The electrician returns this week, hopefully not with shaking hands from too much partying as he finishes the 2nd fix.
  • Always make sure you lock your ladders, I have had a couple of spectacular tumbles so far.  The worst day however was when my mum appeared to help paint and slid to the floor as the steps buckled under her.  The guilt was unbelievable, but she was OK if not a bit shaken.
  • Following on from that, invest in a small platform.  Much more comfy than balancing on a step ladder.
  • Invest in a strong metal extending pole for rollers.  Some of the ceilings in this house are 12 foot and the stairwells up to 20 feet, and the pole makes painting a breeze.

Here are some more in progress pictures, remember the crappy garden full of brambles, mattresses and rubbish?

Before:

IMG_2392

And now:

 

We found a patio area and an old lined formal pond under the mess, as well as a lot of bicycle parts!  So we re-used the pond as a formal bed planted with box which will grow into a cute hedge with a Bay tree in the middle, and relaid new stones in the patio area surrounded with Cotswold chippings.  New lawn and a variety of ornamental grasses in the rear beds finished it off.  The garden was also fenced for privacy.  I will add lots of pots of flowering plants when the house is marketed, plus more seating in the front patio area.

Continue reading

House Renovation Diary Part 2

For the last few weeks I have not had a minute spare to post anything, and have been trying to juggle the renovation, still do another existing part-time job, carry out my school Governor role, look after my kids and still run the family home.  I kid you not, this is multi-tasking to another level.  Luckily, we women have brains that can compartmentalize and manage these feats, otherwise I should be a gibbering wreck being carted off to an institution for intense therapy!

IMG_2603

My view for the next few weeks

PROGRESS

So, since the last post the house renovations has been cracking onwards.  All of the walls have been stripped bare, discovering along the way that the original builders glued woodchip wallpaper straight onto bare plasterboard in some areas, which is impossible to remove without damage. At least 3 walls had this finish so we had to budget for more extensive works to them to get them sorted out.  Who invented that paper and why?

I had to source a building team pretty quickly, and was amazed at some of the outrageous quotes that came in from various trades.  Differences for wiring quotes, as an example, were from £2,800 to £10,000 for the house.  The phrase ‘are you having a laugh?’ came to mind (and more explicit ones that I will not share)..  However, perseverance and a lot of cash deals sorted out a great team.  I then contracted the builders to come in and do the following lengthy list:

Plasterboard where necessary all ceilings and aforementioned walls, re-plaster all rooms  in the house, re-wire and chase in all new electrics, re-plumb, move two walls, install new central heating and radiators, hang & fit all new doors,fit two bathrooms and one kitchen… the list goes on and on.  I also have a gardener stripping out the hideous junkyard that was the garden, with new lawn, planting and fencing coming next week.  My main job is decorating both internally and externally, chosing the kitchen, bathrooms and flooring.  I have been sourcing new joinery and hardware for all the doors in the house, and am become a wizard with my tape measure and minute measurements!  I am also on first name terms now with trade suppliers at the Builders yards in the city.

I asked my building team to start from the top down so I can at least prep the new plaster with mist coats whilst the messy work is being done.  We are at the stage of first fix electrics being finished, and 50% of the house is plastered.  Most floorboards are up and the debris is incredible.  It’s a dust bomb basically, it even gets in my teabags somehow.

Stripping a room, can someone explain the painting method on the door to me please?

IMG_2526

So here are some photos of the works so far.  A small loo has the wall smashed down in preparation for extending it into a shower room.

Continue reading