Renovating a House – Part 2

Long time since the last post, but I have been working so hard that I just did not have time to write anything.  My hands look like a 90 year olds – all wrinkled and chapped from grafting, but the house is moving along now.

WEEKS 3-6

Since the last post lots has happened at the house.  The electricians have finished their main bulk of work.  They lifted pretty much every floor board in the house, chased cables into walls, drilled through external walls and upgraded the system.  I now have lots of down-lighters, plus where I needed them, extraction for the bathroom and so on.  A new consumer unit comes this week, to generally pump up the power in the house and make it compliant with regulations.

Following their main fix, the plasterer has been back to make good the walls and ceilings where the electricians had been hacking away.  Finally I could get on with decorating, I was hovering about waiting for them all to finish a lot and just made a lot of cups of tea.  We also had a heatwave in the middle of the work, so it got quite steamy especially when hanging off ladders using wallpaper strippers.  At one point it was 29 degrees and I was staring into a steam machine, it was like my very own mini swedish sauna.

Here is the kitchen roof before and after – from wrinkled, uninsulated dark ceiling to new insulation, plaster, roof lights, down-lighters, (oh and the hidden beams which cost a bomb!).

THE KITCHEN

I had a dream, just like Martin Luther King, but mine was more geared towards a shaker bespoke handmade kitchen with industrial leanings.  The kitchen roof saga has delayed this dream, mainly due to my very expensive new beams hidden beneath the plasterboard and the extra time and labour needed.  So the new kitchen can wait, but this was what was left and it offends my design sensibilities!

It is VERY orange.  So I got out my trusty paint pots and started to amend the offending pine with black, grey and white.  Farrow and Ball Lamp Black for the doors, new ironmongery and some industrial steel stainless shelving are creating a transformation that I can live with until we replace it totally next year.  Phew…

The walls are all dark grey, it is called ‘Grey Shingle’ by Valspar.  I removed the cheesy glass doors on two wall units and lined the back of the cupboard in trompe l’oeil wallpaper of metro tiles, then painted any orange wood bits left with white satinwood.  The shelves will be lined in trompe l’oeil marbled paper.

Continue reading

Advertisements